Whole-Home Remodeling in the Portland Area

A whole-home remodel updates most of the house at once: often the kitchen, bathrooms, layout, systems and finishes together. Doing it in one project can cost less than a string of separate remodels, but it takes more planning, longer permitting and usually means moving out.

At a glance

  • Permits: Moving, removing or adding walls, and new plumbing, wiring or mechanical work, all need permits, with architectural plans showing existing and proposed conditions.
  • Major alterations: Removing more than half of the exterior walls triggers Portland's 35-day neighbor notice before the permit is issued.
  • Older homes: Lead-safe rules for pre-1978 homes and asbestos checks apply to almost every whole-home project.
  • Who to hire: A design-build firm or a general contractor working with an architect or designer.

What drives the cost of a whole-home remodel

  • Scope. How many rooms you touch, and whether the layout changes.
  • Systems. Replacing wiring, plumbing, heating or adding cooling often makes sense when walls are open, and adds cost.
  • Structure. Removing load-bearing walls, seismic upgrades and foundation work need engineering.
  • Finishes. Cabinets, tile, flooring and fixtures across the whole house.

Phasing the work can spread out costs, but doing it all at once usually saves on demolition, permits and setup. A contractor who prices as the design develops helps you keep scope and budget aligned; see Design-Build or General Contractor.

Permits: what Portland requires

According to the City of Portland, most interior alterations need a permit, including cutting or resizing openings, moving, removing or adding walls, and adding a bathroom. Plumbing, electrical and mechanical work need their own permits.

Major alterations. Under Portland's major residential alteration and addition rules, removing more than 50% of the exterior walls above the foundation, or adding more than 500 square feet of new interior space, requires notice to neighbors and neighborhood groups at least 35 days before the permit can be issued. Changing scope after the permit is issued can require a revision or a new permit.

Questions: Portland permitting general inquiries, 503-823-7300. Outside Portland, your city or county building department sets its own rules; see your location page.

If your home is older

  • Lead paint: In homes built before 1978, the contractor needs an Oregon Lead-Based Paint Renovation license and must follow lead-safe rules (Oregon Health Authority).
  • Asbestos: Oregon DEQ recommends a survey by an accredited inspector before renovation (Oregon DEQ).
  • Hidden conditions: Old wiring, galvanized pipe and past unpermitted work are common once walls are open.

More in What to Expect When Remodeling an Older Portland Home.

How a whole-home remodel usually unfolds

  1. Goals and budget. What has to change and what can wait.
  2. Design and engineering. Floor plans, selections and structural plans. See How to Hire a Remodeler.
  3. Permits. Plan review, plus the 35-day notice for major alterations.
  4. Construction. Demolition, structural work, rough-ins and inspections, insulation and drywall, then cabinets, tile and finishes.
  5. Final inspection and punch list.

Questions to ask before you hire

  • Have you remodeled whole homes like mine, and can I see them?
  • Will you handle design, engineering and permits?
  • Is the contract fixed-price, and what allowances are included?
  • How do you handle surprises found once walls are open?
  • Will we need to move out, and for how long?
  • What does your warranty cover? See Remodeling Warranties.

Sources checked November 6, 2026: Portland.gov, Residential permits; Portland.gov, Major residential alteration and addition permits; Oregon Health Authority; Oregon DEQ. General information, not legal advice.