ADUs (Accessory Dwelling Units) in the Portland Area

An accessory dwelling unit (ADU) is a second, self-contained living space on a lot that already has a house. In Portland, ADUs take many shapes, including a new detached cottage, an addition to the house, a converted garage or a converted basement. ADUs are popular for family members, rental income or a future place to downsize.

At a glance

  • Size: In most cases no more than 75% of the main home's living area or 800 square feet, whichever is less.
  • How many: Many Portland residential lots can have one ADU, and some can have two if at least one is detached.
  • Fees: Portland can waive system development charges if you agree not to use the property as a short-term rental for 10 years.
  • Who to hire: A design-build firm or builder with ADU experience, plus a licensed electrician (owners can't do ADU electrical work themselves).

Types of ADUs

  • Detached: A new cottage, usually in the back yard. Typically the most expensive and the most private.
  • Attached: An addition to the house with its own entrance.
  • Garage conversion: Turns an existing detached or attached garage into a unit.
  • Basement conversion: Turns a basement, or sometimes an attic, into a unit. Often the lowest cost, since the structure already exists.

What drives the cost of an ADU

  • New vs. conversion. Building new means a foundation, framing, roof and full utilities.
  • Utilities. Sewer, water and electrical connections, and whether service needs upgrading.
  • Site. Access for equipment, slopes and tree protection.
  • Fees. System development charges apply unless they're waived.

Portland offers free pre-approved plans for detached ADUs, which can save design time; see the city's ADU page.

Rules: what Portland requires

According to Portland's ADU zoning code:

  • Size: An ADU can be no more than 75% of the main home's living area or 800 square feet, whichever is less. The limit doesn't apply when converting the basement of a house that's been on the site at least five years.
  • Number: In most single-dwelling zones you can have one ADU, or two if at least one is detached and the lot meets minimum size and street-frontage rules.
  • Placement: A detached ADU must be set back at least 40 feet from the front lot line or sit behind the rear wall of the house, and meet the base zone's standards for accessory structures.

Permits. The city requires a building permit plus electrical, plumbing and mechanical permits, and the electrical work must be done by a licensed electrician.

SDC waiver. Through Portland's ADU SDC waiver, you can avoid system development charges on a new ADU by signing a covenant not to rent the ADU or the house as a short-term rental for 10 years. Revoking the covenant costs 150% of the fees that were waived.

Adding an ADU will likely raise your home's assessed value; check with your county assessor.

Questions: Portland permitting general inquiries, 503-823-7300. Outside Portland, your city or county building department sets its own rules; see your location page.

How an ADU project usually unfolds

  1. Feasibility. Confirm what your lot allows and where utilities can connect.
  2. Design. Custom or pre-approved plans. See How to Hire a Remodeler.
  3. Permits, plus the SDC waiver covenant if you're using it.
  4. Construction. Site work and foundation (or demolition for a conversion), framing, rough-ins and inspections, then finishes.
  5. Final inspection.

Questions to ask before you hire

  • How many ADUs have you built in Portland, and can I see them?
  • Will you handle design, permits and utility connections?
  • Do you work with pre-approved plans, custom plans or both?
  • Is the contract fixed-price, and what's excluded (utilities, fees, landscaping)?
  • How long from permit to move-in?
  • What does your warranty cover? See Remodeling Warranties.

Sources checked November 6, 2026: Portland.gov, Accessory dwelling units; Portland Zoning Code 33.205; Portland.gov, ADU SDC waiver. General information, not legal advice.